Welcome:
Dear Engineers

Deswik GO 2023.2

Deswik.GO 2023 is a version of Deswik’s strategic mine planning software that utilizes mathematical multi-pit optimization. It focuses on maximizing Net Present Value (NPV) by enabling users to make informed design and scheduling decisions throughout the mining value chain. This version likely includes updates and new features related to stockpile constraints within the Deswik.Blend module.


Available versions: 2023.x ,…


Deswik GO 2023.2 Tested Picture

Key features and capabilities of Deswik.GO, including those potentially introduced or enhanced in the 2023 version:

  • Multi-pit optimization:
    Deswik.GO uses fast, mathematical algorithms to optimize multiple pits simultaneously, which can lead to improved strategic mine planning.
  • Deswik.Blend module updates:
    2023 may include new features or enhancements in the Deswik.Blend module, potentially related to stockpile constraints, allowing users to switch between Free and Fill and Reclaim modes.
  • Strategic mine planning:
    The software aims to help users make better design and scheduling decisions across the entire mining operation.
  • NPV maximization:
    Deswik.GO is designed to help users maximize the NPV of their mining operations by optimizing pit designs and schedules.
  • Integration with other Deswik modules:
    Deswik.GO is part of the broader Deswik suite of mining software, likely integrating with other tools for a more comprehensive planning process.
  • DBS (Divergent Branching and Sequencing):Deswik.GO is noted for using DBS, a newer approach to pit optimization, alongside other MILP methods, to create optimal pit shapes that consider realistic scenarios and maximize value.
  • Potential updates to Deswik.Scheduler:
    The 2023.1 version might also include improvements or new features related to scheduling, which is a crucial aspect of mine planning.

In summary, Deswik.GO 2023 is a version of Deswik’s strategic mine planning software that uses mathematical optimization to help mining companies maximize NPV through improved pit designs and scheduling.It likely incorporates updates to the Deswik.Blend module and potentially other areas related to scheduling and overall mine planning.


Please enable JavaScript in your browser to complete this form.
* Full name and version
=

Login

Register